An empirical study of collaborative capacity evaluation and scheduling optimization for a CPD project

Xiaolei Wang, Tiejun Ci, Sang-Bing Tsai, Aijun Liu and Quan Chen

PLOS ONE, 2018, vol. 13, issue 8, 1-16

Abstract: In a collaborative product design project, reasonable resource allocation can shorten the development cycle and reduce cost. Team capacity evaluation and a task-team scheduling model are presented. A collaborative team capacity model is constructed, and a 2-tuple linguistic method is used to evaluate the capacity of collaborative teams. Next, the matching degree between design task and collaborative team is defined. A collaborative product design scheduling model considering task-team matching is developed. Combined with the simulated annealing operator, based on the single-coding strategy, self-adaptive multi-point cross and mutation, an improved genetic algorithm is proposed to solve the model. Finally, a case study is presented to validate the method.

Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0200753 (text/html)
https://journals.plos.org/plosone/article/file?id= ... 00753&type=printable (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:plo:pone00:0200753

DOI: 10.1371/journal.pone.0200753

Access Statistics for this article

More articles in PLOS ONE from Public Library of Science
Bibliographic data for series maintained by plosone ().

 
Page updated 2025-03-19
Handle: RePEc:plo:pone00:0200753