EconPapers    
Economics at your fingertips  
 

Study on forecasting method of power engineering cost based on BIM and DynGCN

Huijing Zhai and Jiangtao Ma

PLOS ONE, 2025, vol. 20, issue 5, 1-15

Abstract: In view of the shortcomings of power engineering cost in precision and dynamic in big data environments, this paper proposes building information modelling (BIM) and spatiotemporal modelling-based dynamic graph convolutional neural networks (DynGCN). This study uses the characteristics of BIM technology to carry out the cost management of the whole life cycle of power engineering, and realizes the dynamic control of the cost. In addition, the DynGCN method is used to predict the cost of each engineering link, so as to optimize the construction scheme of the whole project. The results show that the whole life cycle data management supported by BIM technology improves the real-time monitoring and adjustment ability of the cost; the DynGCN method can greatly improve the accuracy of the cost prediction, and the prediction accuracy is 96%, which is closest to the real value of the cost.

Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0322202 (text/html)
https://journals.plos.org/plosone/article/file?id= ... 22202&type=printable (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:plo:pone00:0322202

DOI: 10.1371/journal.pone.0322202

Access Statistics for this article

More articles in PLOS ONE from Public Library of Science
Bibliographic data for series maintained by plosone ().

 
Page updated 2025-05-10
Handle: RePEc:plo:pone00:0322202