Developing a manager-informed indicator framework for public sport facility performance measurement: Evidence from perceived indicator importance
Xuanye Pan,
Caiying Chen,
Nor Eeza Zainal Abidin and
Mohd Salleh Aman
PLOS ONE, 2026, vol. 21, issue 11, 1-20
Abstract:
Public sport facility performance measurement draws on provision, user-experience, and distributive indicators, yet these indicators are often considered separately and their roles within a common framework remain unclear. This study developed a manager-informed input–output indicator framework for organising candidate indicators before operational performance measurement. A cross-sectional survey of 228 personnel with management-related responsibilities for public sport facilities in Fujian Province, China, asked participants to rate the importance of five provision-side and eight outcome-side indicators on a five-point scale. The main model retained all 13 indicators and specified both blocks as composites; two reduced-indicator models served as sensitivity analyses. Mean importance ratings ranged from 3.68 to 3.87, and between 62.7% and 70.6% of respondents rated each candidate indicator as important or very important. The Input Importance Composite was positively associated with the Output Importance Composite (β = 0.601, t = 11.879, p
Date: 2026
References: Add references at CitEc
Citations:
Downloads: (external link)
https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0361375 (text/html)
https://journals.plos.org/plosone/article/file?id= ... 61375&type=printable (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:plo:pone00:0361375
DOI: 10.1371/journal.pone.0361375
Access Statistics for this article
More articles in PLOS ONE from Public Library of Science
Bibliographic data for series maintained by plosone ().