Financial resource scheduling and road construction projects performance in Nairobi Metropolitan, Kenya
Karuga Rwamba,
Morrisson Mutuku and
Paul Sang
Additional contact information
Karuga Rwamba: Department of Management Science, Kenyatta University, Nairobi, Kenya
Morrisson Mutuku: Department of Management Science, Kenyatta University, Nairobi, Kenya
Paul Sang: Department of Management Science, Kenyatta University, Nairobi, Kenya
International Journal of Research in Business and Social Science (2147-4478), 2024, vol. 13, issue 4, 223-229
Abstract:
Kenya has seen a boom in road building during the last couple of years as a result of the government's significant investments in the construction industry to upgrade infrastructure, such as road networks. Road network construction is one of the key pillar of the country long term vision 2030. However, the performance of the road projects has experienced various challenges leaving some roads uncompleted, others poorly done after huge investment of public resources. This study sought to evaluate the influence of financial resources scheduling on the performance of road construction projects in Nairobi Metropolitan, Kenya. The research was based on resource dependence theory. A descriptive design as well as the cross-sectional survey was used. The population of interest for this study consisted of 39 road construction projects being implemented by Kenya Urban Roads Authority and Kenya National Highway Authority within the Nairobi metropolitan area. A semi structured questionnaire was utilized to collect primary data. The quantitative data was analyzed using descriptive and inferential statistics. The study results revealed projects resource scheduling had a positive and significant effect on project performance of road construction projects in Nairobi Metropolitan, Kenya. The study concludes that effective financial resource scheduling enables that organization to manage risk that may occur from changes in the project’s outcome. Financial resource scheduling starts from developing the project budget which is a process for allocating administered and departmental funds necessary to build a financial foundation for producing stated project deliverables. Key Words:Financial, Resources, Scheduling, Road, Project, Performance, Kenya
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.ssbfnet.com/ojs/index.php/ijrbs/article/view/3345/2330 (application/pdf)
https://doi.org/10.20525/ijrbs.v13i4.3345 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:rbs:ijbrss:v:13:y:2024:i:4:p:223-229
Access Statistics for this article
International Journal of Research in Business and Social Science (2147-4478) is currently edited by Prof.Dr.Umit Hacioglu
More articles in International Journal of Research in Business and Social Science (2147-4478) from Center for the Strategic Studies in Business and Finance Editorial Office,Baris Mah. Enver Adakan Cd. No: 5/8, Beylikduzu, Istanbul, Turkey. Contact information at EDIRC.
Bibliographic data for series maintained by Umit Hacioglu ().