Managing Complexity: A Comprehensive Study of the Matiari to Lahore ±660kV DC Transmission Line Project
Chen Hongtao and
Zhu Ying Lin
Additional contact information
Chen Hongtao: Senior Project Manager, University of Geoscience Beijing, Department of Electrical Engineering
Zhu Ying Lin: Senior Design Manager, Henan Agriculture University, department of engineering of Architectural Design
Bulletin of Business and Economics (BBE), 2024, vol. 13, issue 2, 553-562
Abstract:
The construction of a ±660kV DC transmission line, such as the Matiari to Lahore project in Pakistan, represents a significant and complex undertaking requiring advanced project management expertise. This project involves foundation laying, tower assembly, and wiring, necessitating collaboration across multiple professions and departments. To ensure success, it is critical to adopt cost-effective strategies that minimize expenses, accelerate construction timelines, and prioritize safety. This paper explores various strategies to optimize the construction of ±660kV DC transmission lines. Key strategies include the use of energy-efficient technologies, such as high-efficiency conductors and transformers, which reduce operational costs and energy losses. Additionally, durable materials like advanced composites and corrosion-resistant alloys enhance infrastructure longevity and reliability. Modular construction methods, which allow for pre-fabrication of components, are emphasized for their ability to speed up construction, improve quality control, and reduce waste. These methods also enhance safety by minimizing on-site construction time and exposure to hazardous conditions. Conducting rigorous safety audits is essential for identifying potential hazards and ensuring appropriate safety measures. Employing sophisticated project management software improves organizational coherence, facilitates communication, tracks progress, and identifies potential issues early. Interdisciplinary project management teams are crucial for enhancing coordination and ensuring project success. These teams integrate experts from engineering, construction, logistics, and environmental science to address diverse project challenges effectively. Stakeholder engagement and community involvement are also emphasized to address concerns, gain support, and ensure the project meets the needs of all parties involved. Transparent communication and proactive engagement help prevent delays and disruptions. By incorporating these strategies, we aim to optimize construction efficiency while maintaining the critical infrastructure integrity of the ±660kV DC transmission line. This paper provides valuable insights into best practices and innovative approaches for future large-scale and complex projects.
Keywords: 660kV DC Transmission Project; Transmission Line; Power Engineering; Construction (search for similar items in EconPapers)
Date: 2024
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://bbejournal.com/BBE/article/view/840/888 (application/pdf)
https://bbejournal.com/BBE/article/view/840 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:rfh:bbejor:v:13:y:2024:i:2:p:553-562
DOI: 10.61506/01.00352
Access Statistics for this article
Bulletin of Business and Economics (BBE) is currently edited by Dr. Muhammad Irfan Chani
More articles in Bulletin of Business and Economics (BBE) from Research Foundation for Humanity (RFH) Contact information at EDIRC.
Bibliographic data for series maintained by Dr. Muhammad Irfan Chani ().