La prévision à l’aide des modèles ARMMI et d’information à priori
Pierre A. Cholette
Additional contact information
Pierre A. Cholette: Groupe de la désaisonnalisation, Statistique Canada
L'Actualité Economique, 1981, vol. 57, issue 4, 553-564
Abstract:
The method of ARIMA forecasting with benchmarks developed in this paper allows the production of univariate forecasts which take into account the historical information of a series, captured by an ARIMA model (Box and Jenkins, 1970), as well as partial prior information on the future behaviour of the series. The prior information, or benchmarks, stems from the conclusions of a study on the phenomenon to be extrapolated, from forecasts of an annual econometric model or simply from pessimistic, realistic or optimistic scenarios contemplated by the current economic analyst. It may take the form of annual levels to be achieved, of neighbourhoods to be reached for a given time period, of movements to be displayed or more generally of any linear criteria to be satisfied by the forecasted values. By means of this method, the forecaster may then exercize his current economic evaluation and judgement to the fullest extent in deriving the forecasts, since the labouriousness and the "trial and errors" experienced without a systematic method are avoided.
Date: 1981
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://id.erudit.org/iderudit/601006ar
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ris:actuec:v:57:y:1981:i:4:p:553-564
Access Statistics for this article
L'Actualité Economique is currently edited by Benoit Dostie
More articles in L'Actualité Economique from Société Canadienne de Science Economique Contact information at EDIRC.
Bibliographic data for series maintained by Benoit Dostie ( this e-mail address is bad, please contact ).