Plant Size, Plant Factor, and the Shape of the Average Cost Function in Electric Power Generation: A Nonhomogeneous Capital Approach

John F. Stewart

Bell Journal of Economics, 1979, vol. 10, issue 2, 549-565

Abstract: This paper models an electricity producing firm's ex ante choice of technology for a generating plant in a way that recognizes that planned output is best described by a load increment composed of an instantaneous rate and a time duration and that the cost of capital equipment is dependent on the size and fuel efficiency of the plant. We estimate the cost of equipment function for a sample of plants and use the results to simulate the ex ante average cost surface over a grid of load increments. The major finding of the paper is that plant size has relatively little effect on the average cost, while the plant utilization factor is the major element leading to reductions in average cost as cumulative output expands.

Date: 1979
References: Add references at CitEc
Citations: View citations in EconPapers (14)

Downloads: (external link)
http://links.jstor.org/sici?sici=0361-915X%2819792 ... 3B2-%23&origin=repec full text (application/pdf)
Access to full text is restricted to JSTOR subscribers. See http://www.jstor.org for details.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:rje:bellje:v:10:y:1979:i:autumn:p:549-565

Ordering information: This journal article can be ordered from
https://editorialexp ... i-bin/rje_online.cgi

Access Statistics for this article

More articles in Bell Journal of Economics from The RAND Corporation
Bibliographic data for series maintained by ().

 
Page updated 2025-03-19
Handle: RePEc:rje:bellje:v:10:y:1979:i:autumn:p:549-565