EconPapers    
Economics at your fingertips  
 

Damage Measures for Breach of Contract

Steven Shavell ()

Bell Journal of Economics, 1980, vol. 11, issue 2, 466-490

Abstract: This article studies rules of "damage measures" that determine how much money must be paid by a party who defaults on a contract to the other party to the contract. The theme of the article is that damage measures serve as a substitute for completely specified contracts. In particular, it is shown that under an incompletely specified contract damage measures can induce parties to behave in a way that approximates what they would have explicitly agreed upon under a fully specified contract. Moreover, it is argued on familiar lines that because it is often costly or impossible to make contractual provisions for contingencies at a very detailed level, there is an evident need for such substitutes for well-specified contingent contracts as are afforded by damage measures

Date: 1980
References: Add references at CitEc
Citations: View citations in EconPapers (113)

Downloads: (external link)
http://links.jstor.org/sici?sici=0361-915X%2819802 ... O%3B2-0&origin=repec full text (application/pdf)
Access to full text is restricted to JSTOR subscribers. See http://www.jstor.org for details.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:rje:bellje:v:11:y:1980:i:autumn:p:466-490

Ordering information: This journal article can be ordered from
https://editorialexp ... i-bin/rje_online.cgi

Access Statistics for this article

More articles in Bell Journal of Economics from The RAND Corporation
Bibliographic data for series maintained by ().

 
Page updated 2025-03-31
Handle: RePEc:rje:bellje:v:11:y:1980:i:autumn:p:466-490