EconPapers    
Economics at your fingertips  
 

The Economies of Alternative Levels of Reliability for Electric Power Generation Systems

Michael L. Telson

Bell Journal of Economics, 1975, vol. 6, issue 2, 679-694

Abstract: Providing excess electrical generation capacity for reliability purposes has an economic cost; it is also true that higher reliability adds to the value of electric service. After some point, however, the additional benefits do not warrant the additional cost. In this paper we examine the considerations that should determine sensible reliability levels for electric generation systems. We construct a cost/benefit argument which suggests -- subject to various provisos that we make -- that the present "1-day-in-10-year" loss of load probability target reliability planning criterion may be uneconomically high and that these targets might reasonably be reduced to at least a "5-day-in-10-year" level.

Date: 1975
References: Add references at CitEc
Citations: View citations in EconPapers (33)

Downloads: (external link)
http://links.jstor.org/sici?sici=0361-915X%2819752 ... O%3B2-S&origin=repec full text (application/pdf)
Access to full text is restricted to JSTOR subscribers. See http://www.jstor.org for details.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:rje:bellje:v:6:y:1975:i:autumn:p:679-694

Ordering information: This journal article can be ordered from
https://editorialexp ... i-bin/rje_online.cgi

Access Statistics for this article

More articles in Bell Journal of Economics from The RAND Corporation
Bibliographic data for series maintained by ().

 
Page updated 2025-03-19
Handle: RePEc:rje:bellje:v:6:y:1975:i:autumn:p:679-694