The Economies of Alternative Levels of Reliability for Electric Power Generation Systems
Michael L. Telson
Bell Journal of Economics, 1975, vol. 6, issue 2, 679-694
Abstract:
Providing excess electrical generation capacity for reliability purposes has an economic cost; it is also true that higher reliability adds to the value of electric service. After some point, however, the additional benefits do not warrant the additional cost. In this paper we examine the considerations that should determine sensible reliability levels for electric generation systems. We construct a cost/benefit argument which suggests -- subject to various provisos that we make -- that the present "1-day-in-10-year" loss of load probability target reliability planning criterion may be uneconomically high and that these targets might reasonably be reduced to at least a "5-day-in-10-year" level.
Date: 1975
References: Add references at CitEc
Citations: View citations in EconPapers (33)
Downloads: (external link)
http://links.jstor.org/sici?sici=0361-915X%2819752 ... O%3B2-S&origin=repec full text (application/pdf)
Access to full text is restricted to JSTOR subscribers. See http://www.jstor.org for details.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:rje:bellje:v:6:y:1975:i:autumn:p:679-694
Ordering information: This journal article can be ordered from
https://editorialexp ... i-bin/rje_online.cgi
Access Statistics for this article
More articles in Bell Journal of Economics from The RAND Corporation
Bibliographic data for series maintained by ().