The New Soviet Incentive Model
Martin Weitzman
Bell Journal of Economics, 1976, vol. 7, issue 1, 251-257
Abstract:
Suppose y is a "performance indicator" for an enterprise. As examples, y might stand for output, profits, cost savings, or factor productivity. With standard piecework reward systems the manager of an enterprise will try to convince his superiors that y is likely to be small, thereby entitling him to a lower target which is easier to fulfill. A new reform in the Soviet economy is aimed at stimulating more ambitious plans by making the bonus size depend on the plan target as well as the degree to which it has been fulfilled. This novel incentive scheme is modelled in the present paper and its basic properties are analyzed. Some applications and extensions are proposed.
Date: 1976
References: Add references at CitEc
Citations: View citations in EconPapers (56)
Downloads: (external link)
http://links.jstor.org/sici?sici=0361-915X%2819762 ... 3B2-%23&origin=repec full text (application/pdf)
Access to full text is restricted to JSTOR subscribers. See http://www.jstor.org for details.
Related works:
Working Paper: The New Soviet Incentive Model (1974)
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:rje:bellje:v:7:y:1976:i:spring:p:251-257
Ordering information: This journal article can be ordered from
https://editorialexp ... i-bin/rje_online.cgi
Access Statistics for this article
More articles in Bell Journal of Economics from The RAND Corporation
Bibliographic data for series maintained by ().