Costs of Nuclear Power Plant Construction: Theory and New Evidence

John M. Marshall and Peter Navarro

RAND Journal of Economics, 1991, vol. 22, issue 1, 148-154

Abstract: Studies of the cost of construction of nuclear power plants rely upon a measure of cost, called "overnight cost," that contradicts accepted capital theory. The studies report evidence that construction cost per megawatt of capacity decreases as plant scale increases. We employ a more correct measure of cost and compare the results of this measure versus overnight cost for Japanese nuclear power plants. Using overnight cost, the results give "evidence" of economies of scale in Japanese power plants, but when the correct measure of cost is substituted, the scale variable is not statistically significant.

Date: 1991
References: Add references at CitEc
Citations: View citations in EconPapers (9)

Downloads: (external link)
http://links.jstor.org/sici?sici=0741-6261%2819912 ... O%3B2-E&origin=repec full text (application/pdf)
Access to full text is restricted to JSTOR subscribers. See http://www.jstor.org for details.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:rje:randje:v:22:y:1991:i:spring:p:148-154

Ordering information: This journal article can be ordered from
https://editorialexp ... i-bin/rje_online.cgi

Access Statistics for this article

More articles in RAND Journal of Economics from The RAND Corporation
Bibliographic data for series maintained by ().

 
Page updated 2025-03-19
Handle: RePEc:rje:randje:v:22:y:1991:i:spring:p:148-154