Linearity with Project Selection and Controllable Diffusion Rate in Continuous-Time Principal-Agent Problems
Jaeyoung Sung
RAND Journal of Economics, 1995, vol. 26, issue 4, 720-743
Abstract:
I extend Holmstrom and Milgrom's model by allowing the agent to control privately or publicly the diffusion-rate process, and show that the optimal contract is still linear. I discuss the conditions under which conflicts over the choice of diffusion rate do and do not arise. As an application, I examine project- selection problems of a firm. Conflicts between the manager and investors arise because giving the manager too much incentive to work to increase the profit from ongoing operations can induce him to be too conservative in project selection, possibly resulting in optimal contracts with low sensitivities.
Date: 1995
References: Add references at CitEc
Citations: View citations in EconPapers (86)
Downloads: (external link)
http://links.jstor.org/sici?sici=0741-6261%2819952 ... O%3B2-2&origin=repec full text (application/pdf)
Access to full text is restricted to JSTOR subscribers. See http://www.jstor.org for details.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:rje:randje:v:26:y:1995:i:winter:p:720-743
Ordering information: This journal article can be ordered from
https://editorialexp ... i-bin/rje_online.cgi
Access Statistics for this article
More articles in RAND Journal of Economics from The RAND Corporation
Bibliographic data for series maintained by ().