Critical Review on Improving the Claim Management Process in Malaysia

Nor Azmi Bakhary, Azmi Ibrahim and Noor Akmal Adillah Ismail

Journal of Education and Vocational Research, 2013, vol. 4, issue 7, 214-218

Abstract: Claims for additional costs and time extensions result from a variety of events occurring during the course of construction. To enhance the chances of success, contractors when submitting their claims must closely follow the steps stipulated in the contract conditions, by providing a breakdown of alleged additional costs and time with sufficient documentation. This paper aims to provide a better insight on the process of claims management in the Malaysian construction industry. It is reviewing the early part of the PhD research and hopefully the findings will try to generate means of improving the claims management process. With the proper claim management framework, it is hoped that contractors can utilize it to improve their claim management process in the future.

Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://ojs.amhinternational.com/index.php/jevr/article/view/122/122 (application/pdf)
https://ojs.amhinternational.com/index.php/jevr/article/view/122 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:rnd:arjevr:v:4:y:2013:i:7:p:214-218

DOI: 10.22610/jevr.v4i7.122

Access Statistics for this article

More articles in Journal of Education and Vocational Research from AMH International
Bibliographic data for series maintained by Muhammad Tayyab ().

 
Page updated 2025-03-19
Handle: RePEc:rnd:arjevr:v:4:y:2013:i:7:p:214-218