The Efficient Design of Contracts To Purchase Cogenerated Power*
Edward C. Hall and
John E. Parsons
The Energy Journal, 1990, vol. 11, issue 2, 105-117
Abstract:
This paper analyzes long-term power purchase contracts between an electric utility and a cogenerating facility and suggests ways to improve them. It discusses the best way to construct the contract payment structure in light of the given avoided cost structure; analyzing in detail the harmful incentives to low maintenance and how to avoid them. The paper concludes that the method it describes can be used to aid in the better design of contract provisions that will remedy the problem of incentives to low maintenance.
Keywords: Electric utilities; Cogeneration; Power purchase contracts (search for similar items in EconPapers)
Date: 1990
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/ISSN0195-6574-EJ-Vol11-No2-6 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:11:y:1990:i:2:p:105-117
DOI: 10.5547/ISSN0195-6574-EJ-Vol11-No2-6
Access Statistics for this article
More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().