STRATEGY, PLANNING AND COSTING FOR DECOMMISSIONING IN CANADA
Nihal D. Jayawardene and
Peter D. Stevens-Guille
The Energy Journal, 1991, vol. 12, issue 1_suppl, 181-188
Abstract:
Ontario Hydro, the public-owned electric utility in Ontario, Canada, is one of the three largest nuclear utilities in the world. Decommissioning of its CANDU nuclear stations will begin about 2012 when the first station at Pickering is scheduled to be shut down after an operating period of 40 years. Other stations at Bruce and Darlington will be shut down and decommissioned subsequently. The cost of these operations is being charged to customers and is calculated using the annuity method. In this chapter, Nihal Jayawardene and Peter Stevens-Guille describe Ontario Hydro’s decommissioning policy, financial planning and method of funding future decommissioning costs. One policy requirement is that future generations should not have to pay for decommissioning costs; deferring costs far into the future is not financially prudent. The current status of public opinion in Canada on decommissioning and radioactive waste management, including the tourism value of a decommissioned reactor, also is discussed.
Keywords: Nuclear decommissioning; Canada; Ontario Hydro; CANDU; Policy (search for similar items in EconPapers)
Date: 1991
References: Add references at CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/ISSN0195-6574-EJ-Vol12-NoSI-14 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:12:y:1991:i:1_suppl:p:181-188
DOI: 10.5547/ISSN0195-6574-EJ-Vol12-NoSI-14
Access Statistics for this article
More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().