THE PROJECTED INFLUENCE OF EXTENDED UNIT SERVICE
M.E. Lapides
The Energy Journal, 1991, vol. 12, issue 1_suppl, 273-278
Abstract:
If the operational life of a nuclear power plant can be extended, decommissioning will be delayed. In effect, this is an alternative to decommissioning. Is this a sensible or desirable option? In this chapter, M.E. Lapides evaluates the cost, environmental consequences, and funding impacts of delaying for 20 to 30 years. One of his conclusions is that the impacts of decommissioning on any of these three categories will be insignificant to the decommissioning decision. A contrasting view was offered in Chapter 20.
Keywords: Nuclear plant life extension; Costs; Environmental impact; Licence renewal; Extended service (search for similar items in EconPapers)
Date: 1991
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/ISSN0195-6574-EJ-Vol12-NoSI-21 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:12:y:1991:i:1_suppl:p:273-278
DOI: 10.5547/ISSN0195-6574-EJ-Vol12-NoSI-21
Access Statistics for this article
More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().