THE COST OF DECOMMISSIONING U.S. REACTORS: ESTIMATES AND EXPERIENCE
Gene R. Heinze Fry
The Energy Journal, 1991, vol. 12, issue 1_suppl, 87-104
Abstract:
Decommissioning is in its infancy, but our cost experience includes several dozen small, experimental reactors plus the 72 MWe Shippingport reactor. Decommissioning is only beginning at large reactors, but the insights already accumulated allow some use of this experience in future estimates. In this chapter, Gene Heinze Fry compares generic cost estimates plus the data for a total of 21 closed U.S. reactors. Despite the common assumption about the efficiencies that will come with more decommissioning experience, Fry finds a complete lack of scale economies. This could have implications for rates of collection, sufficiency of accumulated funds, and equity issues tied to future generations.
Keywords: U.S. reactors; Nuclear decommissioning costs; Shippingport reactor (search for similar items in EconPapers)
Date: 1991
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/ISSN0195-6574-EJ-Vol12-NoSI-7 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:12:y:1991:i:1_suppl:p:87-104
DOI: 10.5547/ISSN0195-6574-EJ-Vol12-NoSI-7
Access Statistics for this article
More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().