Coordination of Non-utility Generation Through Priority Purchase Contracts*
Joseph A. Doucet
The Energy Journal, 1994, vol. 15, issue 1, 179-191
Abstract:
This paper proposes the use of priority purchase contracts as a means' to coordinate utility purchases from non-utility generators. It is shown that differentiated contracts should have the potential for attracting more diverse NUG proposals (in terms of technical and economic characteristics). It is also argued that differentiated contracts should permit better integration and. coordination of NUG capacity since they come closer to mimicking the utility's resource allocation problem. Several areas for future research are suggested.
Keywords: Electricity. Non-utility generation; Priority purchase contracts; policy (search for similar items in EconPapers)
Date: 1994
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/ISSN0195-6574-EJ-Vol15-No1-11 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:15:y:1994:i:1:p:179-191
DOI: 10.5547/ISSN0195-6574-EJ-Vol15-No1-11
Access Statistics for this article
More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().