Implications of Output Price Risk and Operating Leverage for the Evaluation of Petroleum Development Projects
Gordon Salahor
The Energy Journal, 1998, vol. 19, issue 1, 13-46
Abstract:
This paper is the first in a series that describes how Modem Asset Pricing (MAP) may be used for project evaluation in the upstream petroleum industry. It shows how MAP methods can be used to value a project, if it i's possible to split its cash-flows into two components: one for revenue and one for cost. Two design choices for a "now or never " natural gas field development are used as examples of what can be gained by this type of approach to project evaluation. The first choice involves a tradeoff between capital and operating costs, while the second involves a tradeoff between costs and potential production rate. The results show that the use of standard DCF methods can induce systematic, and possibly misleading, biases into the analyses that lie behind project design and selection.
Keywords: Modern asset pricing; oil industry; oil project valuation; DCF methods (search for similar items in EconPapers)
Date: 1998
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/ISSN0195-6574-EJ-Vol19-No1-2 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:19:y:1998:i:1:p:13-46
DOI: 10.5547/ISSN0195-6574-EJ-Vol19-No1-2
Access Statistics for this article
More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().