EconPapers    
Economics at your fingertips  
 

Dimensioning Reserve Margins of Electrical Energy in Sweden

Roland Andersson and Lewis Taylor

The Energy Journal, 1985, vol. 6, issue 2, 41-60

Abstract: Assessing the impact of electricity shortages is a key problem in determining the optimal reliability of a nation's electrical system. The size of an electrical system's reserve margin will depend to a great extent on how the shortage value is determined. Telson (1975) used macroeconomic data to estimate the upper and lower bounds of the cost for unsupplied electricity. He found the present 1-day-in-10-years loss-of-load probability criterion to be uneconomically excessive and proposed that the criterion be reduced at least to the 5-days-in-10-years level.

Keywords: Electricity shortages; system reserve margin; Sweden; loss-of-load (search for similar items in EconPapers)
Date: 1985
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/ISSN0195-6574-EJ-Vol6-No2-4 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:6:y:1985:i:2:p:41-60

DOI: 10.5547/ISSN0195-6574-EJ-Vol6-No2-4

Access Statistics for this article

More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().

 
Page updated 2025-06-08
Handle: RePEc:sae:enejou:v:6:y:1985:i:2:p:41-60