Inefficiency of Avoided Cost Pricing of Cogenerated Power
Chi-Keung Woo
The Energy Journal, 1988, vol. 9, issue 1, 103-114
Abstract:
Section 210 of the Public Utility Regulatory Act of 1978 requires that the rates paid to qualifying small power production facilities (QFs) should be "just and reasonable" and "shall not discriminate against qualifying cogenerators." However, the rates should not "exceed the incremental cost to the electric utility of the alternative electric energy." Armed with this federal regulation, the California Public Utilities Commission (CPUC) in July 1985 issued Decision No. 85-07-022 for the Phase I of the Order-Instituting-Rulemaking No. 2 (OIR-2) arguing that privately owned electric utilities should pay QF's the cost of owning and operating a power plant that can be displaced by QF production. The total avoided cost is the difference between total cost of utility generation before QF production and after QF production (see Appendix 1 of the CPUC decision).
Keywords: Avoiided cost pricing. Electricity cogeneration; Inefficieny; small power production facilities; Regulation (search for similar items in EconPapers)
Date: 1988
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/ISSN0195-6574-EJ-Vol9-No1-9 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:9:y:1988:i:1:p:103-114
DOI: 10.5547/ISSN0195-6574-EJ-Vol9-No1-9
Access Statistics for this article
More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().