Input — Output Multipliers When Data are Incomplete or Unreliable
G Lorenzen
Additional contact information
G Lorenzen: University of Hamburg, von-Melle-Park 5, 2000 Hamburg 13, FRG
Environment and Planning A, 1989, vol. 21, issue 8, 1075-1092
Abstract:
A general class of estimation procedures for input — output multipliers is introduced which is flexible enough to cope with all possible sets of information within the input — output framework. The class of procedures is general in the sense that multipliers derived from updated input — output tables, as well as some of the existing shortcut multiplier formulae, are included as borderline cases. Furthermore, the procedures are general in the sense that different types of multipliers (output multipliers, employment multipliers, final demand multipliers, etc) are dealt with simultaneously. It is also demonstrated how these estimation procedures could be supplemented by calculating deterministic intervals for the true but unknown results.
Date: 1989
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.1068/a211075 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:envira:v:21:y:1989:i:8:p:1075-1092
DOI: 10.1068/a211075
Access Statistics for this article
More articles in Environment and Planning A
Bibliographic data for series maintained by SAGE Publications ().