Quality Assurance in Construction by Independent Experts: A Case Study of the Efficiency Performance of State-Owned Enterprises in China
Ping Yung and
Lawrence W C Lai
Environment and Planning B, 2009, vol. 36, issue 4, 682-697
Abstract:
As a contribution to the wider theoretical discussion on quality assurance in team production, this case study describes, using the capital–output ratio as a measure of efficiency performance, the quality control problems of Chinese construction state-owned enterprises and explains, with reference to relevant scholarly opinions, why the outcome of legislative requirements for experts falls short of expectations in terms of neo-institutional economic reasoning. This is so, even though the law apparently addresses the principal-agent problem in teamwork by strengthening monitoring.
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.1068/b34038 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:envirb:v:36:y:2009:i:4:p:682-697
DOI: 10.1068/b34038
Access Statistics for this article
More articles in Environment and Planning B
Bibliographic data for series maintained by SAGE Publications ().