Standard Critical Path and Selection of Most Economic and Quality Contractors for Construction of Thermal Power Plant: A Case Study in NTPC

D. K. Choudhury

Metamorphosis: A Journal of Management Research, 2019, vol. 18, issue 2, 103-118

Abstract: In India, most of the thermal power plants were built by National Thermal Power Corporation (NTPC) Ltd and different state electricity boards. The thumb rule indicates that out of the total project construction cost, 70 per cent goes to the cost of project materials, while 30 per cent goes to the cost construction work which leads us to select the most competitive material suppliers and construction contractors. The objectives of this research work are (a) to select a contractor based on cost economy, (b) to find out the standard critical path for constructing a thermal power plant, and (c) to identify the critical activities in constructing a 500 MW thermal power plant. Through literature review, six important factors were identified to judge the quality of the contractor before awarding the contract. In project management, the selection of contractor on the basis of probability of their performance comes within the purview of decision under risk, and hence decision tree has been used as a methodology for the selection of contractor. For computing the critical path, the project network for the construction of the thermal power plant was constructed. The five thermal power projects of NTPC—NTPC Korba, NTPC Talcher, NTPC Rihand, NTPC Sipat, and NTPC Simhadri—were considered, and the construction data of these five projects were used to compute the critical path. Since the completion data of different activities of five projects at different geographical locations with different climates, different site conditions, and different conglomerate of workers were used, so the critical path estimated was accepted as the standard critical path.

Keywords: Power Project; Decision Tree; Project Network; Critical Path; Project Activities (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://journals.sagepub.com/doi/10.1177/0972622519872653 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:sae:metjou:v:18:y:2019:i:2:p:103-118

DOI: 10.1177/0972622519872653

Access Statistics for this article

More articles in Metamorphosis: A Journal of Management Research
Bibliographic data for series maintained by SAGE Publications ().

 
Page updated 2025-03-19
Handle: RePEc:sae:metjou:v:18:y:2019:i:2:p:103-118