Neo-Liberalising Energy Production: The Making and Unmaking of an Ultra Mega Power Project in South India

Preetha K. V. and Ajit Menon

Review of Development and Change, 2019, vol. 24, issue 2, 242-258

Abstract: Abstract This article critiques the increasing neo-liberalisation of energy production through a case study of the coal-based Cheyyur ultra mega power project in Tamil Nadu, India. Recent literature has suggested that the state has facilitated megaproject-based neo-liberalism by exempting such projects from both environmental clearance and land acquisition processes. We argue, to the contrary, that in the case of the Cheyyur thermal power project, the poor implementation of environmental regulations and land acquisition has given space to different local and supralocal actors to legally contest and challenge destructive development. In a context where coal-based energy production is becoming uneconomical and renewable energy is being increasingly promoted, this does not bode well for such energy projects.

Keywords: Megaproject; UMPP; environmental regulation; land acquisition; neo-liberal development (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://journals.sagepub.com/doi/10.1177/0972266119886675 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:sae:revdev:v:24:y:2019:i:2:p:242-258

DOI: 10.1177/0972266119886675

Access Statistics for this article

More articles in Review of Development and Change
Bibliographic data for series maintained by SAGE Publications ().

 
Page updated 2025-03-19
Handle: RePEc:sae:revdev:v:24:y:2019:i:2:p:242-258