EconPapers    
Economics at your fingertips  
 

Interruption modelling in electrical power distribution systems using the Weibull—Markov model

R Medjoudj, D Aissani, A Boubakeur and K D Haim

Journal of Risk and Reliability, 2009, vol. 223, issue 2, 145-157

Abstract: This paper develops an application of the Markov and Weibull—Markov methods to evaluate the effects of maintenance actions on the availability and reliability of electrical distribution systems. It unifies existing models and critically reviews them on their applicability to electrical components. Both methods are applied to investigate the expected performances of underground and overhead circuits. It compares expected performance in terms of failure rates, outage times, and availability. Based an a threshold reliability value and maximum benefit, specific preventive maintenance actions are defined for reliability improvement for each component and therefore for the system. The results obtained by the Weibull—Markov method would seem to be more realistic. A range of recommendations is formulated for practical considerations which may be of interest to operators, as well as to managers of these systems.

Keywords: electrical distribution system; reliability analysis; preventive maintenance; Markov and Weibull—Markov models (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://journals.sagepub.com/doi/10.1243/1748006XJRR215 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:sae:risrel:v:223:y:2009:i:2:p:145-157

DOI: 10.1243/1748006XJRR215

Access Statistics for this article

More articles in Journal of Risk and Reliability
Bibliographic data for series maintained by SAGE Publications ().

 
Page updated 2025-03-19
Handle: RePEc:sae:risrel:v:223:y:2009:i:2:p:145-157