On operation termination for degrading systems with two types of failures
Maxim Finkelstein,
Gregory Levitin and
Oleg A Stepanov
Journal of Risk and Reliability, 2019, vol. 233, issue 3, 419-426
Abstract:
When a failure occurring during a system operation can result in considerable penalties, it can be more cost-effective to terminate the operation at some time avoiding the risk of future failures. This strategy can be relevant for aging systems, for example, when the system failure rate is increasing. The paper analyzes three strategies of termination for systems with major and minor failures. A major failure automatically terminates the operation, whereas the minor failures are minimally repaired. We show that the age-based strategy outperforms the one with termination after the m th minimal repair. The combined strategy when the termination is performed at time t or upon the m th minimal repair, whichever comes first, is also considered. The emphasis for the latter setting is on the practically relevant case when the number of possible minimal repairs is limited. Numerical examples illustrating the findings are presented.
Keywords: Mission termination; expected profit; minimal repair; Poisson process; optimal strategy (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://journals.sagepub.com/doi/10.1177/1748006X18802654 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:risrel:v:233:y:2019:i:3:p:419-426
DOI: 10.1177/1748006X18802654
Access Statistics for this article
More articles in Journal of Risk and Reliability
Bibliographic data for series maintained by SAGE Publications ().