Problems of Cost-Recovery in Development Projects: Experience of The Lusaka Squatter Upgrading and Site/Service Project
Biswapriya Sanyal
Additional contact information
Biswapriya Sanyal: Department of Urban Studies and Planning at Massachusetts Institute of Technology, Cambridge Massachusetts 02139
Urban Studies, 1987, vol. 24, issue 4, 285-295
Abstract:
This paper analyzes the problem of cost-recovery from participants in a major squatter upgrading and site/service project in Lusaka, Zambia. It evaluates the project with respect to five requirements, the fulfillment of which is suggested as necessary for achieving a satisfactory rate of re-payment: (i) the project must be affordable; (ii) the participants must understand the nature of their financial obligation; (iii) the system of collection of payment must be efficient; (iv) incentives and sanctions must be adequate and appropriate; and (v) there must be consistent political support for cost-recovery. The evaluation indicates that though the Lusaka project was affordable by most of the participants, it did not fulfill the four other requirements. The paper concludes with additional guidelines for the design of future projects.
Date: 1987
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://journals.sagepub.com/doi/10.1080/00420988720080461 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sae:urbstu:v:24:y:1987:i:4:p:285-295
DOI: 10.1080/00420988720080461
Access Statistics for this article
More articles in Urban Studies from Urban Studies Journal Limited
Bibliographic data for series maintained by SAGE Publications ().