Минимальный цикл однопредметной линии со сложной структурой
Тютюкин Виктор Константинович
Additional contact information
Тютюкин Виктор Константинович: СПбГУ
Vestnik of the St. Petersburg University. Series 5. Economics Вестник Санкт-Петербургского университета. Серия 5. Экономика, 2009, issue 2, 134-143
Abstract:
This article is devoted to minimization of the production cycle length for the robot line. For the first time this task is considered for rather common and complex situation of several machines in operation and industrial robots. In many cases, such preconditions are necessary for feasibility of the production program in the planning period. Problem in point is turned into the standard «task of the stone heap"» for decision of which an effective algorithm is known.
Keywords: "TASK OF THE STONE HEAP"; MULTIPLE-MACHINE SERVICING (OPERATION) (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:
Downloads: (external link)
http://cyberleninka.ru/article/n/minimalnyy-tsikl- ... -slozhnoy-strukturoy
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:scn:003571:14813840
Access Statistics for this article
More articles in Vestnik of the St. Petersburg University. Series 5. Economics Вестник Санкт-Петербургского университета. Серия 5. Экономика from CyberLeninka, Федеральное государственное бюджетное образовательное учреждение высшего образования «Санкт-Петербургский государственный университет»
Bibliographic data for series maintained by CyberLeninka ().