The Coordinated Development of Off shore Energy Infrastructure: Legal Challenges and Possible Solutions
H.K. Müller
Competition and Regulation in Network Industries, 2013, vol. 14, issue 3, 291-314
Abstract:
There will be an enormous growth of off shore wind energy generation in the North Sea if current plans are given effect. Standard practice for wind farms constructed to date has been to provide each wind farm with a dedicated cable connection to the onshore transmission system (radial connection). A more efficient approach would be to initiate coordinated projects that involve the clustering of wind farms and consequently allow for shared off shore assets. This could lower the costs and reduce the impacts on the marine environment. However, national regimes currently focus on the installation of radial connections and do not promote the coordinated development of off shore infrastructure. The purpose of this article is to identify the legal barriers to these coordinated projects and to explore what changes could be made to the current regulatory practices of the North Sea states in order to introduce the required coordination between wind energy generation and infrastructure development.
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sen:journl:v:14:i:3:y:2013:p:291-314
Access Statistics for this article
Competition and Regulation in Network Industries is currently edited by Hans Kluwer
More articles in Competition and Regulation in Network Industries from Intersentia
Bibliographic data for series maintained by Petra Van den Bempt ( this e-mail address is bad, please contact ).