A Goal Programming Model for Rescheduling of Generation Power in Deregulated Markets
E. Centeno,
B. Vitoriano,
A. Campos,
A. Muñoz,
J. Villar and
E.F. Sánchez-Úbeda ()
Annals of Operations Research, 2003, vol. 120, issue 1, 45-57
Abstract:
In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented. Copyright Kluwer Academic Publishers 2003
Keywords: electricity markets; power generation dispatch; goal programming; integer programming; short-term scheduling (search for similar items in EconPapers)
Date: 2003
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1023/A:1023366127386 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:120:y:2003:i:1:p:45-57:10.1023/a:1023366127386
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1023/A:1023366127386
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().