Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system
Wai Foong (),
Angus Simpson,
Holger Maier and
Stephen Stolp
Annals of Operations Research, 2008, vol. 159, issue 1, 433-450
Abstract:
A number of algorithms have been developed for the optimization of power plant maintenance schedules. However, the true test of such algorithms occurs when they are applied to real systems. In this paper, the application of an Ant Colony Optimization formulation to a hydropower system is presented. The formulation is found to be effective in handling various constraints commonly encountered in practice. Overall, the results obtained using the ACO formulation are better than those given by traditional methods using engineering judgment, which indicates the potential of ACO in solving realistic power plant maintenance scheduling problems. Copyright Springer Science+Business Media, LLC 2008
Keywords: Power plant maintenance scheduling; Hydropower; Hydroelectricity; Ant colony optimization; Constraints; Heuristics (search for similar items in EconPapers)
Date: 2008
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1007/s10479-007-0277-y (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:159:y:2008:i:1:p:433-450:10.1007/s10479-007-0277-y
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1007/s10479-007-0277-y
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().