Abstract: In this work discrete-continuous project scheduling problems with discounted cash flows are considered. These problems are characterized by the fact that activities of a project simultaneously require discrete and continuous resources for their execution. A class of these problems is considered, where the number of discrete resources is arbitrary, and there is one continuous, renewable resource, whose total amount available at a time is limited. Activities are non-preemptable, and the processing rate of an activity is a continuous, increasing function of the amount of the continuous resource allotted to the activity at a time. A positive cash flow (cash inflow) is associated with each activity, and the objective is to maximize the net present value (NPV). The discrete-continuous resource-constrained project scheduling problem with discounted cash flows (DCRCPSPDCF) is defined. Four payment models are considered: lump-sum payment at the completion of the project, payments at activity completion times, payments at equal time intervals, and progress payments. Some properties of optimal schedules are proved for two important classes of processing rate functions: all functions not greater than a linear function (including linear and convex functions), and concave processing rate functions. Copyright Springer Science+Business Media, LLC 2014

Keywords: Discrete-continuous project scheduling; Discounted cash flows; Net present value; Payment model (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://hdl.handle.net/10.1007/s10479-011-1014-0 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:213:y:2014:i:1:p:319-340:10.1007/s10479-011-1014-0

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479

DOI: 10.1007/s10479-011-1014-0

Access Statistics for this article

Annals of Operations Research is currently edited by Endre Boros

More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:annopr:v:213:y:2014:i:1:p:319-340:10.1007/s10479-011-1014-0