EconPapers    
Economics at your fingertips  
 

Effects of different cut-to-length harvesting structures on the economic value of a wood procurement planning problem

Amira Dems (), Louis-Martin Rousseau () and Jean-Marc Frayret ()

Annals of Operations Research, 2015, vol. 232, issue 1, 65-86

Abstract: In this paper, we develop a mixed integer linear model for a practical multi-facility wood-procurement planning problem using a cut-to-length (CTL) bucking system. This forest management problem is difficult to solve since it integrates the forest bucking problem and the multi-facility supply planning problem. A priority-list approach was used to generate adequate bucking patterns in the Eastern Canadian context. The model provides decision support with respect to how to harvest the different cut-blocks according to the bucking priority list used, and in what quantities harvested logs should be transported to sawmills. It aims to minimize the nonlinear harvesting cost, the transportation cost, and the inventory cost and to maximize the product value (i.e., profit maximization). The harvesting cost considers the nonlinearity of the harvester productivity function, which is an important aspect of the decision-making process in forest management. The model was used to compare the current bucking scenario to two new possibilities. These scenarios allow us to investigate the gains and losses that arise from the use of different bucking aggregations. Specifically, we consider the impact on the number of different log types per block and thus on the associated harvesting cost. Moreover, we aim to better understand the cost/benefit trade-offs of a more complex decision structure in a Canadian wood-procurement context. The results of our scenario tests showed that forest bucking aggregation (the current practice) significantly reduces the company’s profit. A simple bucking disaggregation that does not increase the operational cost can improve the outcome. Copyright Springer Science+Business Media New York 2015

Keywords: Cut-to-length harvesting system; Forest bucking problem; Wood-procurement planning; Mixed integer programming (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://hdl.handle.net/10.1007/s10479-013-1336-1 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:232:y:2015:i:1:p:65-86:10.1007/s10479-013-1336-1

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479

DOI: 10.1007/s10479-013-1336-1

Access Statistics for this article

Annals of Operations Research is currently edited by Endre Boros

More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:annopr:v:232:y:2015:i:1:p:65-86:10.1007/s10479-013-1336-1