Correction to: Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources
Zdeněk Hanzálek () and
Přemysl Šůcha ()
Additional contact information
Zdeněk Hanzálek: Czech Technical University in Prague
Přemysl Šůcha: Czech Technical University in Prague
Annals of Operations Research, 2018, vol. 264, issue 1, No 24, 545-545
Abstract:
Abstract Due to some technical issues with article HTML, Algorithm 1 appeared twice and there was no ILP formulation.
Date: 2018
References: Add references at CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s10479-017-2704-z Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:264:y:2018:i:1:d:10.1007_s10479-017-2704-z
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1007/s10479-017-2704-z
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().