EconPapers    
Economics at your fingertips  
 

Correction to: Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources

Zdeněk Hanzálek () and Přemysl Šůcha ()
Additional contact information
Zdeněk Hanzálek: Czech Technical University in Prague
Přemysl Šůcha: Czech Technical University in Prague

Annals of Operations Research, 2018, vol. 264, issue 1, No 24, 545-545

Abstract: Abstract Due to some technical issues with article HTML, Algorithm 1 appeared twice and there was no ILP formulation.

Date: 2018
References: Add references at CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s10479-017-2704-z Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:264:y:2018:i:1:d:10.1007_s10479-017-2704-z

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479

DOI: 10.1007/s10479-017-2704-z

Access Statistics for this article

Annals of Operations Research is currently edited by Endre Boros

More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:annopr:v:264:y:2018:i:1:d:10.1007_s10479-017-2704-z