Developing a new stochastic model considering bi-directional relations in a natural disaster: a possible earthquake in Tehran (the Capital of Islamic Republic of Iran)
Masoud Mahootchi () and
Sajjad Golmohammadi ()
Additional contact information
Masoud Mahootchi: Amirkabir University of Technology
Sajjad Golmohammadi: Amirkabir University of Technology
Annals of Operations Research, 2018, vol. 269, issue 1, No 21, 439-473
Abstract:
Abstract Timely, effective delivery of relief resources to the sufferers in a natural disaster is quite crucial. All governments especially those having high risk of natural disasters must have a comprehensive and implementable plan to suitably manage humanitarian issues after a natural disaster occurs. They should construct sufficient facilities and prepare and store enough relief items (e.g., tents, medical packages, and meals) to be able to quickly respond to necessary needs of injured and homeless people; otherwise, it might lead to humanitarian crises with high numbers of casualties. In this study, we extend the mathematical two-stage stochastic optimization model proposed by Mete and Zabinsky (Int J Prod Econ 126:76–84, 2010) simultaneously considering two phases: pre- and post-disaster. All decisions pertinent to the pre-disaster phase, such as the locations of warehouse and pre-positioned relief items, should be taken in the first stage; however, other decisions pertinent to the post-disaster phase, such as the allocations of warehouses to the demanding points are taken in the second stage. In this study, we consider bi-directional relations between warehouses, which can increase the flexibility of the constructed network to handle the needs of injured people in a shorter time interval. Furthermore, whereas the relief process should be implemented within a specific time interval (e.g., 3 days), our extended optimization model is constructed for a multi-period and multi-product situation. We construct the extended model based on a professional report prepared by the Japanese International Cooperation Agency in a study of the seismic micro zoning of Tehran on April 13, 1999. The respective data in this report has also been updated based on the reports of Tehran Municipality to be matched with the current situation of Tehran. The results of our extended multi-period model for the respective real case study in this paper verify suitable responses and better services to the affected areas compared to what are provided through the respective single-period optimization model.
Keywords: Disaster management; Stochastic programming; Humanitarian logistics; Network design; Earthquake (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://link.springer.com/10.1007/s10479-017-2596-y Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:269:y:2018:i:1:d:10.1007_s10479-017-2596-y
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1007/s10479-017-2596-y
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().