Single-machine serial-batch delivery scheduling with two competing agents and due date assignment

Yunqiang Yin, Doudou Li, Dujuan Wang () and T. C. E. Cheng
Additional contact information
Yunqiang Yin: Kunming University of Science and Technology
Doudou Li: Kunming University of Science and Technology
Dujuan Wang: Sichuan University
T. C. E. Cheng: The Hong Kong Polytechnic University

Annals of Operations Research, 2021, vol. 298, issue 1, No 23, 497-523

Abstract: Abstract We consider a set of single-machine batch delivery scheduling problems involving two competing agents under two due date assignment models. Belonging to one of the two agents, each job is processed and delivered in a batch to its agent, where the jobs in each batch come from the same agent. The jobs in a batch are processed sequentially and the processing time of a batch is equal to the sum of the processing times of the jobs in it. A setup time is required at the start of each batch. The dispatch date of a job equals the delivery date of the batch it is in, i.e., the completion time of the last job in the batch. There is no capacity limit on each delivery batch, and the cost per batch delivery is fixed and independent of the number of jobs in the batch. The due date of each job is a decision variable, which is to be assigned by the decision maker using one of two due date models, namely the common and unrestricted due date models. Given the due date assignment model, the overall objective is to minimize one agent’s scheduling criterion, while keeping the other agent’s criterion value from exceeding a threshold given in advance. Two kinds of scheduling criteria are involved: (i) the total cost comprising the earliness, tardiness, job holding, due date assignment, and batch delivery costs; and (ii) the total cost comprising the earliness, weighted number of tardy jobs, job holding, due date assignment, and batch delivery costs. For each of the problems considered, we show that it is $$\mathcal {NP}$$ NP -hard in the ordinary sense and admits a fully polynomial-time approximation scheme.

Keywords: Scheduling; Due date assignment; Batch delivery; Two agents; Dynamic programming (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)

Downloads: (external link)
http://link.springer.com/10.1007/s10479-018-2839-6 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:298:y:2021:i:1:d:10.1007_s10479-018-2839-6

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479

DOI: 10.1007/s10479-018-2839-6

Access Statistics for this article

Annals of Operations Research is currently edited by Endre Boros

More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:annopr:v:298:y:2021:i:1:d:10.1007_s10479-018-2839-6