A bi-objective hierarchical program scheduling problem and its solution based on NSGA-III
Wuliang Peng (),
Jiali Lin,
Jingwen Zhang and
Liangwei Chen
Additional contact information
Wuliang Peng: Yantai University
Jiali Lin: Yantai University
Jingwen Zhang: Northwestern Polytechnic University
Liangwei Chen: Yantai University
Annals of Operations Research, 2022, vol. 308, issue 1, No 15, 389-414
Abstract:
Abstract In enterprise project management systems, a program at the tactical level coordinates and manages multiple projects at the operational level. There are close relationships between multiple projects in a program, which are typically manifested as shared resources and precedence relationships. Most research efforts have concentrated on the resource sharing by projects, while the precedence relationships between projects have yet to be comprehensively investigated. In this paper, a bi-objective hierarchical resource-constrained program scheduling problem proposed, where both resource sharing and precedence relationships between projects are considered in a distributed environment. The problem contains two different sub-problems at the operational level and the tactical level, and they are modeled in the same way as two bi-objective multi-mode scheduling problems. Shared resources are allocated from the tactical level to the operational level, and once they are allocated to a project, they can only be re-allocated to other projects once the current project is finished. Subsequently, a two-phase algorithm based on NSGA-III is developed. The algorithm runs at the operational level and the tactical level in turn. According to the Pareto fronts of projects that are submitted from the operational level, the bi-objective program planning at the tactical level is conducted under the constraints of precedence relationships and shared resources. The results of computational simulations demonstrate the satisfactory performance of the improved algorithm. By coordinating the local optimization of projects and the global optimization of the program in a hierarchical framework, the method proposed in this paper provides an effective integrated scheduling method for decision-makers at various levels of a program.
Keywords: Project management; Program scheduling; Multi-project scheduling; Multi-objective optimization; Genetic algorithm (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://link.springer.com/10.1007/s10479-021-04106-z Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:308:y:2022:i:1:d:10.1007_s10479-021-04106-z
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1007/s10479-021-04106-z
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().