Correction to: Evaluating the optimal timing and capacity of investments in flexible combined heat and power generation for energy-intensive industries
Dimitrios Zormpas and
Giorgia Oggioni
Additional contact information
Giorgia Oggioni: University of Brescia
Annals of Operations Research, 2024, vol. 332, issue 1, No 44, 1161 pages
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s10479-023-05316-3 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:332:y:2024:i:1:d:10.1007_s10479-023-05316-3
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1007/s10479-023-05316-3
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().