An integrated fuzzy MCDM model for prioritizing strategies for successful implementation and operation of the bus rapid transit system
Mouhamed Bayane Bouraima (),
Nyamatari Anselem Tengecha (),
Željko Stević (),
Vladimir Simić () and
Yanjun Qiu ()
Additional contact information
Mouhamed Bayane Bouraima: Southwest Jiaotong University
Nyamatari Anselem Tengecha: Trans Research Africa Limited
Željko Stević: University of East Sarajevo
Vladimir Simić: University of Belgrade
Yanjun Qiu: Southwest Jiaotong University
Annals of Operations Research, 2024, vol. 342, issue 1, No 6, 172 pages
Abstract:
Abstract The selection and prioritization of suitable strategies to address the challenges to the successful operation and implementation of the bus rapid transit (BRT) system is a common problem faced by practitioners and decision-makers. Recent research has widely discussed the issue, but such assessments have remained limited in the city of Dar es Salaam, Tanzania context, where there are mobility difficulties. The present study addresses this research gap and identifies the most critical challenges to BRT implementation and operation, and recommends the most appropriate strategy for overcoming them. Seven strategies are defined. To prioritize these strategies, five criteria are determined. An integrated multi-criteria decision-making model is introduced. Improved Fuzzy Step-Wise Weight Assessment Ratio Analysis based on the Bonferroni operator was used to determine the importance of the criteria. Measurement of alternatives and ranking according to compromise solution was applied to assess and rank the strategies. The results indicate that “frequent flooding at the Jangwani bridge bus terminal” and “long waiting time at bus stops” are the most critical challenges while the fourth alternative “strengthening the operation and management” is the appropriate strategy to be implemented for successful operation and implementation of the BRT system. After that, a five-phase sensitivity analysis is performed to observe the robustness of the proposed approach. The results indicate the flexibility and applicability of the proposed approach can address real-life problems. The proposed methodology in this work can be instrumental in assisting mass transit operators with the successful implementation and operation of the BRT system.
Keywords: Dar es Salaam; BRT; MARCOS; IMF SWARA; Operation; Implementation (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s10479-023-05183-y Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:342:y:2024:i:1:d:10.1007_s10479-023-05183-y
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1007/s10479-023-05183-y
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().