Job shop scheduling with separable sequence-dependent setups
In-Chan Choi and
Osman Korkmaz
Annals of Operations Research, 1997, vol. 70, issue 0, 155-170
Abstract:
In this paper, we consider a job shop scheduling problem in which the setup times of jobs are sequence dependent and separable from their processes. The objective of the problem is to minimize the time required to complete all jobs in the system. We formulate this problem as a mixed integer program and present a simple, polynomial time heuristic procedure for solving it. The procedure is based upon sequentially identifying a pair of operations that provide a minimum lower bound on the makespan of the associated two-jobym-machine problem with release times. A computational study demonstrates the superior performance of the new heuristic over the one developed by Zhou and Egbelu. Copyright Kluwer Academic Publishers 1997
Date: 1997
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://hdl.handle.net/10.1023/A:1018918003761 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:70:y:1997:i:0:p:155-170:10.1023/a:1018918003761
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1023/A:1018918003761
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().