A methodology for integrating cell formation and production planning in cellular manufacturing
Jeffrey Schaller,
S. Selçuk Erengüç and
Asoo Vakharia
Annals of Operations Research, 1998, vol. 77, issue 0, 21 pages
Abstract:
This paper develops a mathematical model for designing cells which can handle time-varying part demands. This is primarily carried out by simultaneously identifying cells and part production plans. Given the computational complexity of the model, we first evaluate the efficacy of several alternative lower bounding methods. Based on these methods, we develop multiple heuristic procedures and evaluate them using published and industry data. The results indicate that a lower bounding scheme using valid inequalities provides strong lower bounds for our model and that the heuristic provides solutions which are near-optimal. Copyright Kluwer Academic Publishers 1998
Date: 1998
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://hdl.handle.net/10.1023/A:1018965025510 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:77:y:1998:i:0:p:1-21:10.1023/a:1018965025510
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1023/A:1018965025510
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().