Group replacement policies for parallel systems whosecomponents have phase distributed failure times
E. Popova and
J.G. Wilson
Annals of Operations Research, 1999, vol. 91, issue 0, 163-198
Abstract:
Consider a system of components operating in parallel. Downtime costs are incurredwhen failed components are not repaired or replaced. There are also fixed, unit repair andreplacement costs associated with the system. The failure distributions of the componentsare assumed to be identically distributed random variables. Results on calculating the expectedcost and variance per unit time of various group replacement policies will be provided.Consideration of variance is important since, in many cases, practitioners wish not only toachieve small expected cost but also to reduce variability from cycle to cycle. Phase distributionsallow for the modeling of a wide range failure time behavior. Closed‐form resultsare derived for the three major classes of group replacement policy (m‐failure, T‐age, and(m, T)) when the underlying distribution is of phase type. Copyright Kluwer Academic Publishers 1999
Date: 1999
References: Add references at CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://hdl.handle.net/10.1023/A:1018941521644 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:91:y:1999:i:0:p:163-198:10.1023/a:1018941521644
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1023/A:1018941521644
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().