Dangers in using earned duration and other earned value metrics to measure a project’s schedule performance
Richard E. Wendell (),
Timothy J. Lowe () and
Mike M. Gordon ()
Additional contact information
Richard E. Wendell: University of Pittsburgh
Timothy J. Lowe: The University of Iowa
Mike M. Gordon: Virginia Tech
Central European Journal of Operations Research, 2023, vol. 31, issue 2, No 12, 665-680
Abstract:
Abstract Earned value metrics are well known measures for assessing the schedule performance of projects. In response to deficiencies from using activity costs in traditional earned value metrics for evaluating a project’s schedule performance, earned duration management was proposed as an alternative measurement approach. In particular, earned duration management gives a new measure of a project’s schedule performance, called the Duration Performance Index, which purports to show how well the project is doing in achieving its target completion date. Herein, this paper demonstrates that, because of the confounding impact of parallel activities in a project, the Duration Performance Index can yield false positives and false negatives about a project’s schedule status. And it shows that claims made about the Index are at best guaranteed to be true for an arbitrarily small window of time. The paper concludes with the observation that earned value metrics for assessing a project’s schedule performance all suffer from the same confounding impact of parallel activities, as well as other issues; and that research on other approaches is needed.
Keywords: Project management; Earned value; Schedule performance indices; Earned duration (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s10100-022-00830-4 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:cejnor:v:31:y:2023:i:2:d:10.1007_s10100-022-00830-4
Ordering information: This journal article can be ordered from
http://www.springer. ... search/journal/10100
DOI: 10.1007/s10100-022-00830-4
Access Statistics for this article
Central European Journal of Operations Research is currently edited by Ulrike Leopold-Wildburger
More articles in Central European Journal of Operations Research from Springer, Slovak Society for Operations Research, Hungarian Operational Research Society, Czech Society for Operations Research, Österr. Gesellschaft für Operations Research (ÖGOR), Slovenian Society Informatika - Section for Operational Research, Croatian Operational Research Society
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().