EconPapers    
Economics at your fingertips  
 

Comparison of discrete- and continuous-time models for scheduling waste wood processing facilities

Olivér Ősz (), Balázs Dávid () and Máté Hegyháti ()
Additional contact information
Olivér Ősz: Széchenyi István University
Balázs Dávid: InnoRenew CoE
Máté Hegyháti: University of Sopron

Central European Journal of Operations Research, 2023, vol. 31, issue 3, No 10, 853-871

Abstract: Abstract With the growing significance of environmental awareness, the role of renewable materials and their reuse and recycling possibilities have become increasingly important. Wood is one of the best examples for this, as it is a material that has a variety of primary uses, while also being a prime candidate for reuse and recycling. An important phase in most waste wood value chains is the processing of bulk waste from various sources, usually by means of shredding. This paper presents methods for scheduling the machines in such a waste wood processing facility, where incoming deliveries of different types of wood are processed by a series of treatment and transformation steps to produce shredded wood. Two mathematical models are developed for the problem that both allow overlaps between consecutive steps to optimize resource flow through the system. One of these is a more traditional discrete-time model, while the other is precedence-based and uses continuous-time variables for the timing of the various tasks. Both modeling techniques have their advantages and shortcomings with regard to the ease of integration of further problem-specific parameters and requirements. Next to providing a sound approach for the identified problem class, another aim is to evaluate, which technique suits better for this problem class, and should be used as a basis for extended and integrated cases in the future. Thus, the performance of these models is compared on instances that were randomly generated based on real-world distributions from the literature.

Keywords: Scheduling; Waste wood processing; Discrete-time model; Precedence-based model; Reverse wood value chain (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://link.springer.com/10.1007/s10100-023-00852-6 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:cejnor:v:31:y:2023:i:3:d:10.1007_s10100-023-00852-6

Ordering information: This journal article can be ordered from
http://www.springer. ... search/journal/10100

DOI: 10.1007/s10100-023-00852-6

Access Statistics for this article

Central European Journal of Operations Research is currently edited by Ulrike Leopold-Wildburger

More articles in Central European Journal of Operations Research from Springer, Slovak Society for Operations Research, Hungarian Operational Research Society, Czech Society for Operations Research, Österr. Gesellschaft für Operations Research (ÖGOR), Slovenian Society Informatika - Section for Operational Research, Croatian Operational Research Society
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:cejnor:v:31:y:2023:i:3:d:10.1007_s10100-023-00852-6