EconPapers    
Economics at your fingertips  
 

MIP formulations for an application of project scheduling in human resource management

Tom Rihm (), Norbert Trautmann () and Adrian Zimmermann ()
Additional contact information
Tom Rihm: University of Bern
Norbert Trautmann: University of Bern
Adrian Zimmermann: University of Bern

Flexible Services and Manufacturing Journal, 2018, vol. 30, issue 4, No 1, 609-639

Abstract: Abstract In the literature, various discrete-time and continuous-time mixed-integer linear programming (MIP) formulations for project scheduling problems have been proposed. The performance of these formulations has been analyzed based on generic test instances. The objective of this study is to analyze the performance of discrete-time and continuous-time MIP formulations for a real-life application of project scheduling in human resource management. We consider the problem of scheduling assessment centers. In an assessment center, candidates for job positions perform different tasks while being observed and evaluated by assessors. Because these assessors are highly qualified and expensive personnel, the duration of the assessment center should be minimized. Complex rules for assigning assessors to candidates distinguish this problem from other scheduling problems discussed in the literature. We develop two discrete-time and three continuous-time MIP formulations, and we present problem-specific lower bounds. In a comparative study, we analyze the performance of the five MIP formulations on four real-life instances and a set of 240 instances derived from real-life data. The results indicate that good or optimal solutions are obtained for all instances within short computational time. In particular, one of the real-life instances is solved to optimality. Surprisingly, the continuous-time formulations outperform the discrete-time formulations in terms of solution quality.

Keywords: OR in the service industries; Human resource management; Project scheduling; Mixed-integer programming; Comparative analysis (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s10696-016-9260-8 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:flsman:v:30:y:2018:i:4:d:10.1007_s10696-016-9260-8

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10696

DOI: 10.1007/s10696-016-9260-8

Access Statistics for this article

Flexible Services and Manufacturing Journal is currently edited by Hans Günther

More articles in Flexible Services and Manufacturing Journal from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:flsman:v:30:y:2018:i:4:d:10.1007_s10696-016-9260-8