Managing premature idleness in high-variety manufacturing

Thimo Bergenhenegouwen, T. A. Arno Kasper (), Jos A. C. Bokhorst and Martin J. Land
Additional contact information
Thimo Bergenhenegouwen: University of Groningen
T. A. Arno Kasper: University of Groningen
Jos A. C. Bokhorst: University of Groningen
Martin J. Land: University of Groningen

Flexible Services and Manufacturing Journal, 2024, vol. 36, issue 4, No 7, 1399-1421

Abstract: Abstract This paper shows the effectiveness of labour transfers in addressing premature idleness caused by controlled order release. Controlled order release restricts order entry to the shop floor and is commonly employed in high-variety manufacturing where it results in benefits such as stable work-in-progress. However, it can increase waiting times when orders are blocked from release, while capacities are idling. This issue, known as premature idleness, negatively impacts delivery performance. Previous studies have primarily focused on addressing premature idleness through input control by releasing new orders to idling workstations. This approach overlooks the potential of output control during premature idleness, transferring labour to assist at other workstations in a dual resource constrained setting. Using simulation, this study demonstrates that output control significantly improves delivery performance—in terms of mean tardiness and percentage tardy—and reduces total and shop floor throughput times. Importantly, this result proves robust, even when the efficiency of the assisting worker is severely limited. Shop-level performance improves despite the efficiency loss of the worker. The impact of the where-rule is minimal, while the efficacy of the priority dispatching rule depends on the joint efficiency of collaborating workers. Finally, we show that combining input control and output control enhances performance, providing opportunities for further research on the role of both control approaches in high-variety manufacturing.

Keywords: Workload control; Premature idleness; Order release; Labour transfers (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s10696-023-09521-x Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:flsman:v:36:y:2024:i:4:d:10.1007_s10696-023-09521-x

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10696

DOI: 10.1007/s10696-023-09521-x

Access Statistics for this article

Flexible Services and Manufacturing Journal is currently edited by Hans Günther

More articles in Flexible Services and Manufacturing Journal from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:flsman:v:36:y:2024:i:4:d:10.1007_s10696-023-09521-x