Correction: A memetic NSGA‑II for the multi‑objective flexible job shop scheduling problem with real‑time energy tariffs
Sascha Christian Burmeister (),
Daniela Guericke () and
Guido Schryen ()
Additional contact information
Sascha Christian Burmeister: Paderborn University
Daniela Guericke: University of Twente
Guido Schryen: Paderborn University
Flexible Services and Manufacturing Journal, 2024, vol. 36, issue 4, No 12, 1573 pages
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s10696-023-09530-w Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:flsman:v:36:y:2024:i:4:d:10.1007_s10696-023-09530-w
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10696
DOI: 10.1007/s10696-023-09530-w
Access Statistics for this article
Flexible Services and Manufacturing Journal is currently edited by Hans Günther
More articles in Flexible Services and Manufacturing Journal from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().