Theoretical semi-quantitative risk assessment methodology for tunnel design and construction processes

Ozgur Satici () and Esra Satici ()
Additional contact information
Ozgur Satici: Karayollari Genel Mudurlugu
Esra Satici: Karayollari Genel Mudurlugu

International Journal of System Assurance Engineering and Management, 2024, vol. 15, issue 7, No 40, 3385-3405

Abstract: Abstract All engineering projects involve risk management applications. Sometimes, risks cannot be effectively managed, leading to catastrophic consequences. Engineers must consciously or unconsciously manage these risks. Regardless of how risks are handled, project risks need to be systematically evaluated. Therefore, risk management procedures must be implemented in every project, particularly in geo-engineering projects, to mitigate undesirable consequences and achieve project objectives. However, the use of risk management procedures in underground excavation projects is not common. Numerous commonly employed underground excavation techniques lack assessment of risks, notably geotechnical risks. Most of them only evaluate rock structures and excavation stability in accordance with the geological structure. This paper combines a universal risk management perspective with the underground engineering discipline. The tunnel engineering design and construction steps were evaluated for uncertainties using Scenario Structuring Modeling techniques to identify both technical and non-technical risks associated with underground excavation. Bayesian Network models were employed to identify connections that contribute to risk. To achieve this, objective and quantitative risk assessment tables have been devised using risk management philosophy, in accordance with tunnel design engineering principles and Turkish procurement laws. The primary objective of this study is to increase awareness of the use of risk management processes in tunnel construction projects and introduce a systematic approach to risk assessment in tunnel engineering projects. As a result, a semi-quantitative risk assessment method based on risk management philosophy is proposed for tunnel design and construction for the first time, evaluating not only geotechnical and engineering risks but also human, financial, and various other sources of risks.

Keywords: Bayesian network; Risk assessment; Scenario structuring modeling; Tunnel construction (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s13198-024-02348-1 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:ijsaem:v:15:y:2024:i:7:d:10.1007_s13198-024-02348-1

Ordering information: This journal article can be ordered from
http://www.springer.com/engineering/journal/13198

DOI: 10.1007/s13198-024-02348-1

Access Statistics for this article

International Journal of System Assurance Engineering and Management is currently edited by P.K. Kapur, A.K. Verma and U. Kumar

More articles in International Journal of System Assurance Engineering and Management from Springer, The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-20
Handle: RePEc:spr:ijsaem:v:15:y:2024:i:7:d:10.1007_s13198-024-02348-1