A joint order acceptance and scheduling problem with earliness and tardiness penalties considering overtime

Xin Li, José A. Ventura () and Kevin A. Bunn
Additional contact information
Xin Li: The Pennsylvania State University
José A. Ventura: The Pennsylvania State University
Kevin A. Bunn: The Pennsylvania State University

Journal of Scheduling, 2021, vol. 24, issue 1, No 5, 49-68

Abstract: Abstract This paper considers a joint order acceptance and scheduling problem under a general scenario. A manufacturer receives multiple orders with a given revenue, processing time, release date, due date, deadline, and earliness and tardiness penalties. The manufacturer can be seen as a single-machine system. Due to limited capacity, the manufacturer cannot process every order and needs to determine the optimal set of accepted orders and corresponding production schedule such that the total profit is maximized. The manufacturer can extend its capacity with overtime by paying an additional cost. A time-indexed formulation is presented to model the problem. Two exact algorithms are proposed. The first algorithm, denoted by DPIA-GR, is a dynamic programming (DP)-based algorithm that starts by solving a relaxed version of the original model and successively recovers the relaxed constraint until an optimal solution to the original problem is achieved. The second algorithm, denoted by DPIA-LRGR, improves DPIA-GR by incorporating Lagrangian relaxation (LR). The subgradient method is employed to find the optimal Lagrangian multipliers. The relaxed model in DPIA-GR and the LR model in DPIA-LRGR can be represented using a weighted di-graph. Both algorithms are equivalent to finding the longest path in the graph and applying a graph reduction strategy to prevent unnecessary computational time and memory usage. A genetic algorithm (GA) is also proposed to solve large-scale versions of the problem. Numerical experiments show that both DPIA-GR and DPIA-LRGR solve the problem efficiently and outperform CPLEX and GA, but DPIA-LRGR offers better performance.

Keywords: Order acceptance; Single-machine scheduling; Earliness and tardiness penalties; Overtime; Dynamic programming; Lagrangian relaxation; Genetic algorithm (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://link.springer.com/10.1007/s10951-020-00672-5 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:jsched:v:24:y:2021:i:1:d:10.1007_s10951-020-00672-5

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10951

DOI: 10.1007/s10951-020-00672-5

Access Statistics for this article

Journal of Scheduling is currently edited by Edmund Burke and Michael Pinedo

More articles in Journal of Scheduling from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:jsched:v:24:y:2021:i:1:d:10.1007_s10951-020-00672-5